YOUR BUSINESS AUTHORITY

Springfield, MO

Log in Subscribe

Cynthia Reeves | SBJ

From the Ground Up: Cox Medical Center South parking garage

1270 E. Primrose St.

Posted online

Owner/developer: CoxHealth
General contractor: J.E. Dunn Construction Co.
Architect: H Design Group LLC
Engineers: Mettemeyer Engineering LLC, structural; CJW Transportation Consultants LLC, civil; CJD Engineering LLC, mechanical, electrical and plumbing; and Palmerton & Parrish Inc., geotechnical
Cost: $14 million
Lender: None
Projected completion: June
Project details: A 511-space parking garage is rising at Cox Medical Center South. The five-level garage will provide employee parking with a skybridge connection to the Wheeler Heart and Vascular Center, an outpatient facility for diagnostic and minimally invasive cardiac and vascular care. Aesthetically, the design of the garage will match the Wheeler building, according to Rod Schaffer, vice president of facilities management for CoxHealth, with a dark brick color to complement the exterior of the existing building. The garage is being built at the site of a former parking lot. The additional dedicated employee parking is expected to make room for more patient and visitor access in an existing garage between the Wheeler building and the Hulston Cancer Center to its south.

Comments

No comments on this story |
Please log in to add your comment
Editors' Pick
Open for Business: The Kebab Shack

The Kebab Shack opened; Hitch Goods launched; and The War Zone Springfield moved.

Most Read
Update cookies preferences